No Obligation Quote - (602) 296-4090
HOME
WHO WE ARE
WHAT WE DO
SERVICES
3D MEP Modeling
BIM COORDINATION
Laser Scanning
CAD Management
Fabrication Drawings
Spool Drawings
HVAC Sheet Metal BIM
Mechanical Piping BIM
Plumbing BIM
Electrical BIM
Matterport 3D Virtual Tour
Drone Capture Services
PORTFOLIO
NEWS & MEDIA
HOME
WHO WE ARE
WHAT WE DO
SERVICES
3D MEP Modeling
BIM COORDINATION
Laser Scanning
CAD Management
Fabrication Drawings
Spool Drawings
HVAC Sheet Metal BIM
Mechanical Piping BIM
Plumbing BIM
Electrical BIM
Matterport 3D Virtual Tour
Drone Capture Services
PORTFOLIO
NEWS & MEDIA
Contact
Project Checklist
Home
>
Project Checklist
1
Business Information
2
Sheet Metal
3
Mechanical Piping
4
Laser Scanning
5
Plumbing
6
Electrical
7
Questions About Project
Business Information
Email
*
Project Name?
*
Business Name?
Name
First
Last
Sheet Metal
If your project does not include sheet metal, please skip this entire section by scrolling to the bottom of the page and hitting "next."
Does your Project Require Sheet Metal?
Yes
No
Please check the following contract documents that will be provided to MLP.
PDF Contract Available
Revit Files Available
ACAD Files Available
Shop Drawings Issue for Approval.
Yes
No
This is the basic issue showing routing, sizes, and equipment tags. It is used to go over the design with the sheet metal superintendent and issue to the GC, engineer, etc.
Shop Drawings Sleeves and Blockouts
Yes
No
ShopDrawings Issue for Construction/Fabrication.
Yes
No
This adds elevations, dimensions, and duct tags.
Level 0 Coordination.
Yes
No
Does not include elevations and is per contract – no design change.
Level 1 Coordination.
Yes
No
Includes Level 0 and minor design changes, value engineering, converting from rectangle to round when 12” and under.
Level 2 Coordination.
Yes
No
Includes level 1 and coordination between the ceiling and structure only.
Level 3 Coordination.
Yes
No
Includes level 2 and “Full BIM” This is LOD 400 and is coordinated between other trades.
Hangers and Supports.
Yes
No
Trimble or total station files
Yes
No
MAJ Files
Yes
No
Shop Drawings As-Built.
Yes
No
These are derived from redlines from the field for needed modifications.
Mechanical Piping
If your project does not include mechanical piping, please skip this entire section by scrolling to the bottom of the page and hitting "next."
Does your project require mechanical piping?
Yes
No
Please check the following contract documents that will be provided to MLP
PDF Contract Available
REvit Files Available
ACAD Files Available
Shop Drawings Issue for Approval.
Yes
No
This is the basic issue showing routing, sizes, and equipment tags. It is used to go over the design with the sheet metal superintendent and issue to the GC, engineer, etc.
Shop drawings sleeves and blockouts.
Yes
No
Shop Drawings Issue for Construction/Fabrication.
Yes
No
This adds elevations, dimensions, and duct tags.
Level 0 Coordination.
Yes
No
Does not include elevations and is per contract – no design change.
Level 1 Coordination.
Yes
No
Includes level 0 and minor design changes, value engineering, includes checking pipe velocity, pipesizes, etc.
Level 2 Coordination.
Yes
No
Includes level 1 and coordination between the ceiling and structure only.
Level 3 Coordination.
Yes
No
Includes level 2 and “Full BIM” This is LOD 400 and is coordinated between other trades.
Hangers and Supports.
Yes
No
Trimble or total station files.
Yes
No
Spools for piping 2 1⁄2” and larger.
Yes
No
Spools for piping 2” and smaller in mechanical rooms.
Yes
No
Spools for pipe racks.
Yes
No
BOM, Bill of Materials.
Yes
No
Shop Drawings As-Built.
Yes
No
These are derived from redlines from the field for needed modifications.
Laser Scanning
If your project does not include laser scanning, please skip this entire section by scrolling to the bottom of the page and hitting "next."
Does your include project Laser Scanning?
Yes
No
Please check the following contract documents that will be provided to MLP
On-site laser scanning with point cloud model
Conversion of point cloud to solids/surfaces for a BOM or that can be clashed against in Navisworks.
Plumbing
If your project does not include plumbing, please skip this entire section by scrolling to the bottom of the page and hitting "next."
Does your project require plumbing
Yes
No
Please check the following contract documents that will be provided to MLP
PDF Contract Available
Revit Files Available
ACAD Files Available
Plumbing sanitary waste and vent.
Yes
No
Plumbing pressure, domestic water, and gas.
Yes
No
Medical Gases.
Yes
No
Shop Drawings Issue for Approval.
Yes
No
This is the basic issue showing routing, sizes, and equipment tags. It is used to go over the design with the plumbing superintendent and issue to the GC, engineer, etc.
Shop drawings sleeves and blockouts.
Yes
No
Shop Drawings Issue for Construction/Fabrication.
Yes
No
This adds elevations, dimensions, and duct tags.
Level 0 Coordination.
Yes
No
Does not include elevations and is per contract – no design change.
Level 1 Coordination.
Yes
No
Includes level 0 and minor design changes, value engineering, includes checking fixture counts against pipe sizes.
Level 2 Coordination.
Yes
No
Includes level 1 and coordination between the ceiling and structure only.
Level 3 Coordination.
Yes
No
Includes level 2 and “Full BIM” This is LOD 400 and is coordinated between other trades.
Hangers and Supports.
Yes
No
Trimble or total station files.
Yes
No
Spools for piping 2 1⁄2” and larger.
Yes
No
Spools for piping 2” and smaller in mechanical rooms.
Yes
No
Spools for pipe racks.
Yes
No
BOM, Bill of Materials.
Yes
No
Shop Drawings As-Built.
Yes
No
These are derived from redlines from the field for needed modifications.
Electrical
If your project does not include electrical, please skip this entire section by scrolling to the bottom of the page and hitting "next."
Does your project require electrical?
Yes
No
Please check the following contract documents that will be provided to MLP
PDF Contract Available
Revit Files Available
ACAD Files Available
Cable Tray and bus duct modeling with clearances.
Yes
No
Electrical Conduit 2” and larger or banks of conduit.
Yes
No
Electrical Conduit 2” and smaller or deck 90’s.
Yes
No
Lighting and fixtures.
Yes
No
Equipment, panels, and transformers.
Yes
No
Fire Alarm and Special systems (radio, security, satellite, etc.)
Yes
No
Shop Drawings Issue for Approval.
Yes
No
Maybe
This is the basic issue showing routing, sizes, and equipment tags. It is used to go over thedesign with the electrical superintendent and issue to the GC, engineer, etc.
Shop drawings sleeves and blockouts.
Yes
No
Shop Drawings Issue for Construction/Fabrication.
Yes
No
This adds elevations, dimensions, and duct tags.
Coordination. “Full BIM”
Yes
No
This is LOD 400 and is coordinated between trades.
Hangers and Supports.
Yes
No
Trimble or Total Station files.
Yes
No
BOM, Bill of Materials.
Yes
No
Shop Drawings As-Built.
Yes
No
These are derived from redlines from the field for needed modifications.
Questions About Project.
These are general questions regarding your project. Feel free to skip any questions you are unsure about.
APPROX. START DATE?
Date Format: MM slash DD slash YYYY
ARE EQUIPMENT SUBMITTALS AVAILABLE, IF NOT HOW SOON WILL THEY BE AVAILABLE AFTER THE START DATE?
WILL EQUIPMENT BE PROVIDED IN A 3D FORMAT (REVIT OR ACAD)?
ESTIMATED FIELD LABOR HOURS?
APPROX. SQUARE FOOTAGE?
NUMBER OF FLOORS?
ADDITIONAL INFORMATION NEEDED TO CONSIDER?
Upload Blueprints
Drop files here or
Accepted file types: pdf, gif, png, ai, eps, jpg, psd.
This iframe contains the logic required to handle Ajax powered Gravity Forms.
2432 West Peoria Avenue
Building 15, Suite 1320
Phoenix, Arizona 85029
(602) 296-4090
Linkedin
Facebook
Twitter
Instagram
Copyright © 2019 MLP Consulting, LLC. All rights reserved.
Close Menu
Call Now Button